Hi,
We are using Feng Office 1.7.5 and plan to move to the last version. This is an old dream, andI already opened a post on this.
I tried to upgrade the current version but it took so long (more than 5 days) because we have many tasks (actually more than 12.000 with 10 to 100 comments for each and the result was not really good.
So I had an other idea : strat with a fresh installation and import the opened tasks only (we don't need the other ones). Is this possible ?
Thank you,
Regards,
Fred